With Poseidon Water’s plans for a Huntington Beach desalination plant approaching the homestretch, critics were as adamant as ever at a Friday workshop, where dozens complained the proposal is environmentally flawed, unneeded and would jack up water rates.

The meeting of the Santa Ana Regional Water Quality Control Board was called to review a draft permit and solicit public comment in advance of a scheduled April 3 vote on the final permit.

Approval rides on whether the board determines the drought-proof project will “use the best available site, design, technology and mitigation measures feasible to minimize the intake and mortality of all forms of marine life.”

(LINK).